Why does a boosted flow test need controlled pressure?

Short answer

Because the test has to prove water gets through at the design flow without overloading older pipework. Leaks are found first, by the five-yearly pressure test at 1.5 times working pressure; uncontrolled pressure only adds stress to joints and valves.

What changes the answer

The system's design data and age. Where the design figures aren't known, the test is planned from what can be confirmed on site.

General information only. What your building needs depends on its systems, its approved design and its condition.