Stormwater pumps — before-winter checklist

For facility and strata managers. Do it in autumn, before the first heavy rain.

  • Pumps run and pump water away.
  • Float switches lift freely and start and stop the pumps.
  • High-level alarm sounds and reaches someone who will act on it.
  • Pits cleared of silt, leaves and rubbish.
  • Discharge pipe clear all the way to where it drains.
  • Control panel shows no faults; duty and standby pumps both work.
  • Someone knows who to call at night: PMP, (08) 6118 6104.