Boosted flow testing, with our own fire truck.

In a real fire, the fire brigade pumps water from its truck into the building's booster to push more water, at higher pressure, through the hydrant system. A boosted flow test does exactly that — with our fire truck in place of theirs — and measures what comes out at the hydrants.

It's the only test that proves the system will do what the fire brigade needs it to do, before the day they need it.

In short

A boosted flow test pumps water into the brigade booster at controlled pressure to prove the system works the way the fire brigade will use it. PMP tests with its own fire truck across WA.

In plain words: A booster is the connection outside the building where the fire brigade pumps water into the system.

Area: all of Western Australia · Updated

Why our own truck matters

The test has to push water through the system at the figures the test calls for — and not past them. Equipment built for other jobs can overshoot, and older pipework, joints and valves don't always survive being pushed harder than the test needs.

Our truck is set up for this work, so we control the pressure through the whole test and stop at the figures the test calls for. You get a true result without putting the system under strain it was never meant to take.

What happens on the day

  1. Plan. We check the design data and the last test results, locate the booster and the hydrants, and agree timing and where the water goes.
  2. Tell the site. Any isolations are arranged with the site before we start.
  3. Set up. The truck connects to the booster; gauges and flow measurement go on the hydrants being tested.
  4. Test. We pump in, raise the pressure to the design figure, and record flow and pressure at the test hydrants.
  5. Put it back. Everything is returned to normal and the site is told the system is back in service.
  6. Report. The results against the design figures, what they mean, and anything that needs fixing.

How often

Every five years, for hydrant systems with a fire brigade booster. It comes straight after the five-yearly pressure test, and only once the system has passed it (AS 1851-2012, Table 4.4.4, Items 4.2 and 4.3).

For fire companies

Most fire companies don't own a truck for this. You don't need to. Book ours, with our crew, under your name or ours, anywhere in Western Australia.

What you receive

The test results, and the record of the pressure test that precedes it. Workmanship guaranteed for 12 months.

Your paperwork, job by job

Photos that help us price it

  1. The booster cabinet with its doors open
  2. The block plan
  3. The last five-yearly test record

Send them with the quote form, text or WhatsApp them to 0439 729 553, or email support@pmpwa.net.au. Already have a service report or defect list? Attach that too.

Related questions

What our clients say

B2M Contracting supplies labour across the Public Transport Authority upgrade works, and we've called on PMP Plumbing & Fire Services for the fire services side many times: boosted flow tests, hydrant flow tests, new hydrant installations and gas suppression commissioning. On a project of this size every contractor has to be organised, and PMP are. Their technicians turn up ready to work, follow the site rules, get the testing done when it's scheduled and hand over clear results and paperwork every time. When we need fire services work done properly and on time, PMP is who we call.

Barry MoranDirector, B2M Contracting Pty Ltd

Questions people ask

What is a boosted flow test?

In a fire, the brigade pumps water from its truck into the building's booster. A boosted flow test does exactly that, with PMP's own fire truck in place of theirs, and measures what comes out at the hydrants.

How often is it needed?

Every five years for hydrant systems with a fire brigade booster, straight after the five-yearly pressure test at 1.5 times working pressure, and only once the system has passed it (AS 1851-2012).

Can you do it under our company's name?

Yes. Book PMP's truck and crew under your name or ours, anywhere in Western Australia. Your clients stay yours — PMP never approaches them.

Will the test damage our pipes?

It should not — that is the purpose of controlling the pressure. The system has already passed its pressure test before we start, and we don't go past the figures the test calls for. If the test finds a weak point, it has found something that would have failed in a real fire.

Does the building need to be empty?

No. We work with the site so occupants aren't affected, and tell them if anything will be noticeable.

Where does all the water go?

We plan that before the day, and agree it with the site.

What if the system doesn't reach the design figures?

We tell you on the day, and the report sets out what we found and the likely cause — a blockage, a closed or faulty valve, a leak, or a pump problem.

Can you test systems another company maintains?

Yes. Fire companies regularly book our truck for their own contracts.